Tottenham Court Road station
Tottenham Court Road | |
---|---|
Location | St Giles |
Local authority | London Borough of Camden |
Managed by | London Underground |
Owner | Transport for London |
Station code(s) | TCR |
Number of platforms | 6 |
Fare zone | 1 |
London Underground annual entry and exit | |
2019 | 41.99 million[1] |
2020 | 6.05 million[2] |
2021 | 16.04 million[3] |
2022 | 48.95 million[4] |
2023 | 58.73 million[5] |
National Rail annual entry and exit | |
2022–23 | 34.878 million[6] |
2023–24 | 64.219 million[6] |
Key dates | |
30 July 1900 | Opened (CLR) |
22 June 1907 | Opened (CCE&HR) |
24 May 2022 | Opened (Elizabeth line) |
Other information | |
External links | |
Coordinates | 51°30′58″N 0°07′51″W / 51.5162°N 0.1309°W |
London transport portal |
Tottenham Court Road is an interchange station in the West End of London for London Underground and Elizabeth line services.
The London Underground station is served by the Central and Northern lines.[7] On the Central line the station is between Oxford Circus and Holborn stations, and on the Charing Cross branch of the Northern line it is between Goodge Street and Leicester Square stations. The Elizabeth line station is between Bond Street and Farringdon stations.
The station is located at St Giles Circus, the junction of Tottenham Court Road, Oxford Street, New Oxford Street and Charing Cross Road and is in Travelcard Zone 1, with a second entrance at Dean Street.[8]
History
[edit]Central London Railway
[edit]The station opened as part of the Central London Railway (CLR) on 30 July 1900.[9] From that date until 24 September 1933,[9] the next station eastbound on the Central line was the now-defunct British Museum; the next stop in that direction is now Holborn. The platforms are under Oxford Street west of St Giles' Circus and were originally connected to the ticket hall via lifts at the east end of the platforms. The original station building was on the south side of Oxford Street and was designed in common with other CLR stations by Harry Bell Measures. The building and its neighbours were demolished in 2009.
Charing Cross, Euston & Hampstead Railway
[edit]The Charing Cross, Euston & Hampstead Railway (CCE&HR, now part of the Northern line) arrived here on 22 June 1907[10] but used the name Oxford Street until an interchange (linking the eastbound Central line with the southbound Northern line via the ends of the platform) was opened on 3 September 1908[11] from when the present name was used for both lines. The next station north on the Northern line was originally called Tottenham Court Road,[11] but was renamed to Goodge Street at this time.
The original ticket office was directly beneath St Giles circus and was accessed from stairs on three street corners around the Circus. Its original lift shafts and emergency stairs are still extant. A set of emergency stairs can be used as access down to the ends of the Northern line platform. The lift shafts are used for offices and station facilities.
Early improvements
[edit]Like a number of other central area stations, Tottenham Court Road underwent improvements during the 1920s to replace the original sets of lifts with escalators. Works commenced in 1923; a new subsurface ticket hall, under St Giles Circus, was constructed and the escalators came into service on 28 September 1926 (upper set) and 1 February 1926 (lower set).[12] A shaft for three escalators was driven from the ticket hall under the junction down to the east end of the Central line platforms ending at an intermediate circulation space. A further pair of escalators descend from this level to the north end of the Northern line platforms. The lifts were removed and the redundant shafts were used as ventilation ducts. In 1938 a chiller plant began operating at the station. This was decommissioned in 1949.
Passenger congestion entering and leaving the Northern line platforms was partially eased by the addition of a short single escalator at the centre of the platform leading up to a passageway linking to the intermediate circulation area. However, this was in itself a cause of congestion, as traffic trying to leave the station from the Northern line found itself in the path of traffic entering and travelling to the Central line.
In the early 1980s, the entire station was redecorated, losing the distinctive Leslie Green-designed platform tiling pattern of the Yerkes tube lines (which included the CCE&HR), and the plain white platform tiles of the CLR. It was replaced by distinctive mosaics by Eduardo Paolozzi, located on platforms, passages and escalator entrances.
Initial plans for station expansion
[edit]The station had four entrances to the sub-surface ticket hall from the north-east, south-west and north-west corners of the junction and from a subway beneath the Centre Point building which starts on Andrew Borde Street. The entrances were frequently congested leading to occasions during peak periods of the day when they were briefly closed to prevent overcrowding in the station.
In the aftermath of the King's Cross fire in 1987, London Underground was recommended to investigate "passenger flow and congestion in stations and take remedial action".[13] A Parliamentary bill was tabled in 1991 to permit London Underground to improve and expand the frequently congested station, however this was not proceeded with.[14] In 2000, London Underground consulted on a station upgrade including a new larger ticket hall, new escalators and step free access, which would have taken 4 years to construct.[15]
Expansion as part of Crossrail
[edit]The station was eventually reconstructed and upgraded in the mid 2010s as part of the Crossrail project to construct the Elizabeth line,[7] with the £500 million station upgrade taking eight years.[16] To enable the station expansion work to occur, both the Astoria theatres and the original Central line entrance were demolished.[17] During construction, the Central and Northern lines were alternately closed for several months to allow for upgrade works to take place.[18]
Upon completion in 2017, the project delivered:[16]
- A new ticket hall six times larger than previous, located below St Giles Circus and the forecourt of Centre Point
- New public plaza outside Centre Point, with station entrances designed by Hawkins\Brown
- New dedicated set of escalators to access the Northern line
- New and expanded passageways underground
- Escalators down to the eastern end of the future Elizabeth line station.[7]
- Step-free access throughout the station
- Restoration of existing artwork by Eduardo Paolozzi, and a new artwork in the ticket hall by Daniel Buren
On Dean Street, a dedicated western entrance and ticket hall was built to access the new Elizabeth line platforms.[7] These platforms stretch for 230 m (750 ft) between the two ticket halls, underneath Soho Square.[19] The completed western entrance and Crossrail platforms were handed over to TfL in early 2021.[19] Crossrail links Tottenham Court Road to Canary Wharf, Abbey Wood, Stratford, and Shenfield in the east with Paddington, Heathrow and Reading in the west.[7] The central section of the Elizabeth line opened on 24 May 2022 between Paddington and Abbey Wood.[20] Direct service to Reading, Heathrow, Stratford and Shenfield commenced on 6 November 2022.[21]
As part of a plan to raise £500 million from development above new Crossrail stations,[22] a residential development of 92 homes as well as retail units will be built above the western ticket hall by developer Galliard Homes[23] and a new West End theatre as well as retail and office space will be built above the eastern ticket hall by developer Derwent London.[24] The new theatre will be the first West End theatre to open in over 50 years.[25]
Artworks
[edit]In the mid 1980s, Eduardo Paolozzi was commissioned to create an artwork for the station. The design includes panels of tessellated and hand-cut smalti mural mosaic, and is a distinct and noticeable feature of the station. The frenetic design was intended to reflect the station's position adjacent to Tottenham Court Road's large concentration of hi-fi and electronics shops. During the expansion of the station for Crossrail,[26] sections of the mosaic were restored, moved or replaced[27] while other section were destroyed, some sections of which have been removed to be conserved at the University of Edinburgh.[28]
As part of the expansion of the Eastern ticket hall, Art on the Underground commissioned an artwork by Daniel Buren, a French conceptual artist. This work, 'Diamonds and Circles', works 'in situ', was Buren's first permanent public commission in the UK.[29] It comprises colourful diamond and circle shapes, which contrast with Buren's trademark stripes in black and white, fixed to internal glass walls throughout the ticket hall. The artwork was completed in 2017.[30]
As part of the Crossrail project, two artworks were commissioned by Turner Prize–winning artists, one for each ticket hall.[31] At the eastern ticket hall, Richard Wright created a mural of geometric patterns in gold leaf on the concrete ceiling above the Crossrail escalators.[31] At the western ticket hall, Douglas Gordon installed a video artwork above the escalators, involving Gordon's giant blinking eye with names of Soho establishments that no longer exist reflected in it.[31]
Services
[edit]Services at Tottenham Court Road are operated by the Elizabeth line, and London Underground's Central and Northern lines.
The typical off-peak service in trains per hour (tph) is:
Operator/line | Frequency to destination |
---|---|
London Underground Central line[32] |
Westbound 3 tph to White City 9 tph to Ealing Broadway 3 tph to Northolt 9 tph to West Ruislip |
Eastbound 3 tph to Newbury Park 9 tph to Hainault 3 tph to Loughton 9 tph to Epping | |
London Underground Northern line[33] |
Northbound 10 tph to Edgware 8 tph to High Barnet 2 tph to Mill Hill East |
Southbound 10 tph to Kennington 10 tph to Battersea Power Station | |
Elizabeth line[34] | Westbound 6 tph to London Paddington 4 tph to Heathrow Terminal 4 2 tph to Heathrow Terminal 5 2 tph to Maidenhead 2 tph to Reading |
Eastbound 8 tph to Abbey Wood 8 tph to Shenfield |
The station also served by a night service on Friday and Saturday nights as part of the Night Tube. The station is served by Central line trains every 10 minutes in each direction and Northern line trains every 7-8 minutes in each direction.
Preceding station | London Underground | Following station | ||
---|---|---|---|---|
Oxford Circus towards Ealing Broadway or West Ruislip
|
Central line | Holborn | ||
Goodge Street | Northern line Charing Cross Branch
|
Leicester Square | ||
Preceding station | Elizabeth line | Following station | ||
Bond Street | Elizabeth line | Farringdon towards Abbey Wood or Shenfield
| ||
Former services | ||||
Preceding station | London Underground | Following station | ||
Oxford Circus towards Ealing Broadway
|
Central line | British Museum towards Liverpool Street
|
Future developments
[edit]Crossrail 2
[edit]The Crossrail 2 project proposed a station at Tottenham Court Road, the only planned interchange between the Elizabeth line and Crossrail 2.[35] The expanded station built as part of the Crossrail project took the future demands of Crossrail 2 into account, which will allow for less construction disruption if the line is built.[35] The proposals involve a new Crossrail 2 ticket hall on the site of Curzon Soho on Shaftesbury Avenue. This has been criticised by campaigners.[36][37] The station and ticket hall site were first safeguarded as part of the route during the development of the Chelsea-Hackney line in 1991.[38] In November 2020, plans for Crossrail 2 were shelved.[39]
In popular culture
[edit]- The station was used for a sequence in the 1981 film An American Werewolf in London.[40]
- A scene in the 2008 film The Bank Job is set in the station, though it was shot at Aldwych tube station.[41]
- A scene in the musical We Will Rock You is set in the station; the musical played across the street at the Dominion Theatre from 2002 to 2014.[42][43]
Connections
[edit]London Buses day and night routes serve the station.
References
[edit]- ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
- ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
- ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
- ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
- ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
- ^ a b "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
- ^ a b c d e "Tottenham Court Road Station". Crossrail. Archived from the original on 28 October 2010. Retrieved 11 March 2022.
- ^ "Tottenham Court Road" (PDF). Crossrail. Retrieved 24 May 2022.
- ^ a b Clive's Underground Line Guides – Central Line, Dates
- ^ Clive's Underground Line Guides – Northern Line, Dates
- ^ a b Rose, Douglas (1999). The London Underground, A Diagrammatic History. Douglas Rose. ISBN 1-85414-219-4.
- ^ Railways Through The Clay; Croome & Jackson; London; 1993; p169
- ^ Fennell, Desmond (1988). Investigation into the King's Cross underground fire. Great Britain. Department of Transport. London: [For] Department of Transport [by] H.M.S.O. ISBN 0101049927. OCLC 19271585.
- ^ "London Underground (Safety Measures) Act 1991". www.legislation.gov.uk. Retrieved 19 September 2017.
- ^ "Improvements to Tottenham Court Road station". London Transport. 28 February 2000. Archived from the original on 20 June 2000. Retrieved 10 March 2020.
- ^ a b Dick Murray (10 February 2017). "Tottenham Court Road station's £500 million revamp completed as entrances open". London Evening Standard. Retrieved 21 August 2017.
- ^ Crossrail – Proposal for eastern ticket hall Archived 28 September 2007 at the Wayback Machine
- ^ Al-Othman, Hannah (9 December 2015). "The Central line has returned to Tottenham Court Road". Evening Standard. Retrieved 11 March 2022.
- ^ a b Pritchard, James (12 February 2021). "Tottenham Court Road Elizabeth line station enters final commissioning phase". Crossrail. Archived from the original on 12 February 2021. Retrieved 11 March 2022.
- ^ "Elizabeth line: Delayed £18bn Crossrail finally opens". BBC News. Retrieved 24 May 2022.
- ^ Aplin, Lucy (24 May 2022). "Why you need to switch Crossrail trains and when Elizabeth line opens in full". inews.co.uk. Retrieved 26 May 2022.
- ^ "Property development above Elizabeth line stations to create jobs, growth and revenue". Transport for London. 26 March 2018. Retrieved 11 March 2022.
- ^ Morby, Aaron (March 2021). "Galliard to start £55m London Soho resi job". Construction Enquirer. Retrieved 11 March 2022.
- ^ London, Derwent. "Soho Place". Derwent London. Retrieved 11 March 2022.
- ^ Wood, Alex (24 August 2020). "New and refurbished theatre venues set to open soon | WhatsOnStage". www.whatsonstage.com. Retrieved 11 March 2022.
- ^ Aicha Zaa, Will Hurst (2 February 2015). "Campaigners 'disgusted' as builders dismantle Paolozzi murals at Tottenham Court Road". London Evening Standard. Retrieved 21 August 2017.
- ^ "Recreating Paolozzi's great Tottenham Court Road Mosaics". Gary Drostle. 2 December 2016. Retrieved 8 May 2020.
- ^ "Tube station mosaics to be seen in new light in artist's home city". Edinburgh College of Art. University of Edinburgh. Archived from the original on 15 September 2015. Retrieved 26 August 2015.
- ^ Daniel Buren (3 July 2017). "Diamonds and Circles, works in situ". Art on the Underground. Retrieved 21 August 2017.
- ^ Alice Morby (12 July 2017). "Daniel Buren completes installation at Tottenham Court Road tube station". Dezeen.com. Retrieved 21 August 2017.
- ^ a b c "Artwork at Tottenham Court Road". Crossrail. Archived from the original on 25 October 2020. Retrieved 11 March 2022.
- ^ "Central Line Timetable". Transport for London. Retrieved 9 January 2024.
- ^ "Northern Line Timetable". Transport for London. Retrieved 9 January 2023.
- ^ "Elizabeth Line Timetable: December 2023" (PDF). Transport for London. Retrieved 9 January 2024.
- ^ a b "Tottenham Court Road". Crossrail 2. Retrieved 11 March 2022.
- ^ "Celebrities join fight to save Soho's Curzon cinema from Crossrail 2". The Guardian. 22 September 2015. Retrieved 11 March 2022.
- ^ Aron, Isabelle (26 November 2015). "Everyone's angry about... Crossrail 2". Time Out London. Retrieved 11 March 2022.
- ^ [1] Archived 28 May 2008 at the Wayback Machine
- ^ "Crossrail 2 plans shelved as part of £1.8bn TfL funding deal". The Guardian. 2 November 2020. Retrieved 5 June 2022.
- ^ "An American Werewolf in London [1981 feature film]". www.nickcooper.org.uk. 14 April 2004. Retrieved 21 August 2017.
- ^ "The London Underground in Films & TV". www.nickcooper.org.uk. Retrieved 14 January 2019.
- ^ Martland, John (16 January 2004). "We Will Rock You". The Stage Newspaper Limited. Archived from the original on 30 September 2007. Retrieved 1 April 2011.
- ^ We Will Rock You to close after an astonishing 12 years – bestoftheatre.co.uk
External links
[edit]- London Transport Museum Photographic Archive
- City of Westminster, Draft Planning Brief – Crossrail: Tottenham Court Road Station (Eastern Ticket Hall), May 2005, Retrieved 31 January 2008
- Photos of Paolozzi's mosaics in the station
- Conservation of the TCR Station Mosaics
- Images from An American Werewolf in London prior to installation of Paolozzi mosaics
- Rebuilding work and schedule (Transport for London)
- Restoration and rebuild of Central Line Paolozzi mosaics by mosaic artist Gary Drostle
- Rail transport stations in London fare zone 1
- Central line (London Underground) stations
- Northern line stations
- London Underground Night Tube stations
- Proposed Chelsea-Hackney Line stations
- Tube stations in the City of Westminster
- Former Central London Railway stations
- Railway stations in Great Britain opened in 1900
- Former Charing Cross, Euston and Hampstead Railway stations
- Railway stations in Great Britain opened in 1907
- Railway stations served by the Elizabeth line
- Buildings and structures on Tottenham Court Road
- Railway stations located underground in the United Kingdom
- St Giles, London